“Every building deserves the maximum amount of artistic exploration with a considered, deliberate approach. We seek to create spaces which impart feelings that you’re a participant in something exceptional, where function leads to calm, awe or inspiration. Our core values strive to convey that quality in every project we touch, from the modest to the extravagant.” ~Fredrick Franko, Director of Design

Loading...

Health Alliance of the Hudson Valley | Hospital Consolidation Plan

  • Project Size: 125,500-sf
  • Project Location: N/A
  • Project Team: Health Alliance of the Hudson Valley
  • Completion Date: July 2008
  • Construction Cost: $20 Million
  • Owner Contact: David Ginsberg, Perkins Eastman
  • Project Request:

    To prepare a master plan as part of the Berger Commission mandated consolidation of Kingston Hospital and Benedictine Hospital in Kingston, NY to determine space requirements and optimal locations for the various functions.

  • Project Solution:

    HHA, in association with design architect Perkins-Eastman, took part in preparing the master plan focused on various moves and consolidation of services between the two hospitals. The consolidation involved 13 individual projects spread between the two hospitals and included renovation of a 20-bed behavioral health unit, 20-bed orthopedic med/surg unit, 20-bed general med/surg unit, 20-bed pain management/PT/OT unit with rehab gym, 14-bed maternity unit, CCU, and inpatient dialysis, as well as new construction of two lobbies, a 21-bed emergency department addition/renovation, and two-room OR addition. As part of the master plan team Hyman Hayes Associates met with various departments to determine existing space allocation, verified and documented the existing conditions and developed master plan layouts of the overall site, existing space program, and new work planned as part of the consolidation. For the implementation of the master plan Hyman Hayes Associates was responsible for projects at Benedictine Hospital as well as the construction administration services for the entire consolidation project.