Office of General Services (OGS) Design and Construction Group (D&C) | State Owned Facilities Roofing System Replacements

“Every building deserves the maximum amount of artistic exploration with a considered, deliberate approach. We seek to create spaces which impart feelings that you’re a participant in something exceptional, where function leads to calm, awe or inspiration. Our core values strive to convey that quality in every project we touch, from the modest to the extravagant.” ~Fredrick Franko, Director of Design

Loading...

Office of General Services (OGS) | State Owned Facilities Roofing System Replacements

  • Project Size: 115,000-sf Total Roofing
  • Project Location: State Wide
  • Project Team: Office of General Services (OGS)
  • Completion Date: Contracted 2008-2011
  • Construction Cost: $2.75 Million Estimated
  • Owner Contact: William Miller, Team Leader/Project Manager
  • Project Request:

    As part of our term contract with the NYS Office of General Services, HHA was awarded eight reroof replacement projects.

  • Project Solution:

    Some were termed rapid response projects, due to the necessity for quick turnaround, including roofing projects at:

    • Hudson Correctional Facility
    • Edgecombe Correctional Facility
    • Ulster Correctional Facility
    • Taconic Correctional Facility
    • Pilgrim Psychiatric Centers

    The projects totaled approximately 115, 000 sf covering a wide variety of roofing types: EPDM, built-up, traffic bearing athletic deck, asphalt shingles, clay tile, standing seam metal, and historic slate roofs.