Architecture & Interior Design · Latham, New York

General

MTA Bus Depot Roof Top Units Replacement | Bronx, New York

Project Details

HHA designed these large dunnage structures to support several air handling units that were to be placed on the roof of the MTA Bus
Depot. Since the roof joists were not capable of supporting the air handling units, HHA designed the dunnage frames to span over
top of the roof joists and bear on the building frame lines instead. This required the dunnage frames to span 45 feet, and at the same
time, remain relatively light. The dunnage frames were constructed of hot dip galvanized steel for corrosion protection. Access ladders,
guardrails, and platforms were also provided for access to the air handling units.

Project facts

Client
Guth DeConzo Consulting Engineers
Completion
March, 2021
Client Contact
Jeremy McDonald, Principal
MTA Bus Depot Roof Top Units Replacement | Bronx, New York - photo 1
MTA Bus Depot Roof Top Units Replacement | Bronx, New York - photo 2
MTA Bus Depot Roof Top Units Replacement | Bronx, New York - photo 3
MTA Bus Depot Roof Top Units Replacement | Bronx, New York - photo 4
1 / 4

More projects

Contract Testing Laboratory Addition - photo 1

Contract Testing Laboratory Addition

HHA designed a 43,300 SF contract testing laboratory addition with specialized spaces for biosafety testing, pharmaceutical development, and biomanufacturing support.
Saratoga Performing Arts Center (SPAC) - Campus Improvements & Facility Upgrades - photo 1

Saratoga Performing Arts Center (SPAC) – Campus Improvements & Facility Upgrades

HHA provided new construction, renovation, and site improvements at SPAC, including concessions, restrooms, event spaces, backstage upgrades, and campus circulation enhancements.
Curia - formerly AMRI | Organic Chemistry Laboratory Renovation - photo 1

Curia – formerly AMRI | Organic Chemistry Laboratory Renovation

HHA designed a 31,300-square-foot organic chemistry laboratory for Curia, with specialized research labs, custom fume hoods, prep areas, and efficient material and personnel flow.